Publication: A modified hierarchical production planning system integrated with MRP: A case study
Abstract
In this paper, a hierarchical planning system is proposed which integrates aggregate capacity planning with MRP. This system is to be implemented in a metal box manufacturing company which has already installed a multi-user MRP system covering manufacturing activities as well as procurement sales order processing and accounting systems. The hierarchical planning system includes a medium-range aggregate planning model adapted to the firm's requirements and strategies. The model consists of a mathematical formulation which covers labour capacity constraints and includes certain cost estimations in the objective function. The planning horizon of the medium range planning is taken as twelve months in order to cover sales seasonality. The aggregate production quantities resulting from the optimized medium-range planning model are disaggregated according to procedures already found in the literature. Furthermore, the theoretical infeasibilities pertaining to the disaggregation procedures are also resolved in an heuristic manner. Using the latter modified disaggregation procedure, a feasible disaggregated plan is generated for the whole planning horizon. The proposed plan is compared with the current production policy of the firm and it is observed that the proposed plan leads to backorder reduction.
