Mathematical Models for a Batch Scheduling Problem to Minimize Earliness and Tardiness

dc.contributor.authorALABAŞ USLU, ÇİĞDEM
dc.contributor.authorsOgun, Basar; Alabas-Uslu, Cigdem
dc.date.accessioned2022-03-14T10:21:29Z
dc.date.accessioned2026-01-11T16:32:43Z
dc.date.available2022-03-14T10:21:29Z
dc.date.issued2018-05-10
dc.description.abstractPurpose: Today's manufacturing facilities are challenged by highly customized products and just in time manufacturing and delivery of these products. In this study, a batch scheduling problem has been addressed to enable on-time completion of customer orders in a lean manufacturing environment. The problem is optimizing the partitioning of product components into batches and scheduling of the resulting batches where each customer order is received as a set of products made of various components. Design/methodology/approach: Three different mathematical models for minimization of total earliness and tardiness of customer orders are developed to provide on-time completion of customer orders and also, to avoid excess final product inventory. The first model is a non-linear integer programming model whereas the second is a linearized version of the first. Finally, to solve larger sized instances of the problem, an alternative linear integer model is presented. Findings: Computational study using a suit set of test instances showed that the alternative linear integer model is able to solve all test instances in varying sizes within quite shorter computer times compared to the other two models. It has also been showed that the alternative model is able to solve moderate sized real-world problems. Originality/value: The problem under study differentiates from existing batch scheduling problems in the literature owing to the inclusion of new circumstances that are present in real-world applications. Those are: customer orders consisting of multi-products made of multi-parts, processing of all parts of the same product from different orders in the same batch, and delivering the orders only when all related products are completed. This research also contributes to the literature of batch scheduling problem by presenting new optimization models.
dc.identifier.doi10.3926/jiem.2541
dc.identifier.eissn2013-0953
dc.identifier.issn2013-8423
dc.identifier.urihttps://hdl.handle.net/11424/244385
dc.identifier.wosWOS:000445435700003
dc.language.isoeng
dc.publisherOMNIASCIENCE
dc.relation.ispartofJOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectbatch scheduling
dc.subjectearliness and tardiness
dc.subjectmixed integer programming formulation
dc.subjecton-time delivery
dc.subjectCOMMON DUE-DATE
dc.subjectPROCESSING MACHINE
dc.subjectALGORITHMS
dc.subjectCOMPLEXITY
dc.titleMathematical Models for a Batch Scheduling Problem to Minimize Earliness and Tardiness
dc.typearticle
dspace.entity.typePublication
oaire.citation.endPage405
oaire.citation.issue3
oaire.citation.startPage390
oaire.citation.titleJOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM
oaire.citation.volume11

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
file.pdf
Size:
770.05 KB
Format:
Adobe Portable Document Format