Publication:
Study on the Importance of Employee Performance Assessment and Lost Productive Time Rate Determination in Garment Assembly Lines

dc.contributor.authorKAYAR, MAHMUT
dc.contributor.authorsKayar, Mahmut; Bulur, Oyku Ceren
dc.date.accessioned2022-04-25T00:11:05Z
dc.date.accessioned2026-01-10T16:54:24Z
dc.date.available2022-04-25T00:11:05Z
dc.date.issued2017
dc.description.abstractThis study primarily includes theoretical information on the performance and lost productive time of a firm. Furthermore t-shirt sewing operations of a garment firm were analysed and time measurement for each operation was carried out by the time keeping method. By considering the measurements obtained, different performance estimations, the firm's lost productive time rates, and the standard time was calculated within 5 different scenarios. According to each sewing standard time obtained, the assembly line balancing practice was carried out using the Hoffman method. Later on results of the assembly line balancing were compared, and the importance of employee performance assessment and its lost productive time rates for firms were discussed. The aim of the study was to emphasize the value of impeccable determination of the employee performance assessment and lost productive time rates. Consequently garment firms will be more cautious in calculating the standard time and will be able to reach their production target within the accurate measurement they obtain.
dc.identifier.doi10.5604/01.3001.0010.4638
dc.identifier.issn1230-3666
dc.identifier.urihttps://hdl.handle.net/11424/263837
dc.identifier.wosWOS:000416668600019
dc.languageeng
dc.publisherINST CHEMICAL FIBRES
dc.relation.ispartofFIBRES & TEXTILES IN EASTERN EUROPE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectemployee performance
dc.subjectlost productive time
dc.subjectstandard time
dc.subjectassembly line balancing
dc.subjectready-made clothing
dc.subjecthoffman method
dc.subjectBALANCING PROBLEM
dc.titleStudy on the Importance of Employee Performance Assessment and Lost Productive Time Rate Determination in Garment Assembly Lines
dc.typearticle
dspace.entity.typePublication
oaire.citation.endPage126
oaire.citation.issue5
oaire.citation.startPage119
oaire.citation.titleFIBRES & TEXTILES IN EASTERN EUROPE
oaire.citation.volume25

Files