Two-stage production scheduling with separated set-up times and stochastic breakdowns

dc.contributor.authorsAllahverdi A.
dc.date.accessioned2022-03-15T01:53:07Z
dc.date.accessioned2026-01-11T15:10:49Z
dc.date.available2022-03-15T01:53:07Z
dc.date.issued1995
dc.description.abstractThe problem of scheduling a two-machine flowshop, where set-up times are considered as separate from processing times and machines suffer random breakdowns, is addressed with respect to the makespan objective. A dominance relation for minimizing makespan with probability 1 is established. Furthermore, it is shown that Yoshida and Hitomi’s algorithm for the deterministic problem stochastically minimizes makespan when random breakdowns are present. © 1995 Operational Research Society Ltd.
dc.identifier.doi10.1057/jors.1995.122
dc.identifier.issn1605682
dc.identifier.urihttps://hdl.handle.net/11424/246258
dc.language.isoeng
dc.relation.ispartofJournal of the Operational Research Society
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectFlowshop
dc.subjectMachine breakdowns
dc.subjectMakespan
dc.subjectSet-up times
dc.titleTwo-stage production scheduling with separated set-up times and stochastic breakdowns
dc.typearticle
dspace.entity.typePublication
oaire.citation.endPage904
oaire.citation.issue7
oaire.citation.startPage896
oaire.citation.titleJournal of the Operational Research Society
oaire.citation.volume46